| TABLE
OF CONTENTS
I. Introduction
* Purpose
* Authority
* Members
* Meetings
II. Architectural Review Board Policies
III.
Architectural Review Board Process
III. Lot Potentials and Constraints
IV. Minimum Building Standards
V. Building Materials and Uses
VI. Environmental Rules and Regulations
VII. Appendix
A. Submittal Forms
1. Preliminary Design Submittal Checklist
2. Construction Document Submittal Checklist
3. Landscape Plan Submittal Checklist
4. Preliminary Design/Construction Document Submittal Checklist for Additions/Renovations
5. Architectural Certification Sample Letter
6.
Non-Structural Modification Request Form
7.
Acknowledgement Statement for Lot Potentials
B. Sample Plans
1. Site Plan with Erosion Control Measures
2. Typical Elevation
3. Typical Landscape Plan
4. Plant List
C. Material Samples
D. Special Building Guidelines and Building
Envelopes
1. Millingport
2. Swift Island
3. Southpoint
4. Pattersons Bridge
E. Typical Architecture
F. APGI (Yadkin) Shoreline Management Plan
G. Pesticide Selections/Turf Information
H. Construction Requirements and
Builder Information
1. Construction Agreement
2. Sign Policy
3. Silt Fence
INTRODUCTION
Purpose
The
Architectural Review Board (ARB) has developed building guidelines to
provide direction to homesite owners, architects and contractors when
planning, or renovating a residence at Uwharrie Point. The ARB guidelines
allow a diversity of architectural designs while simultaneously assuring
compatibility with the existing architectural direction within the community.
The ARBs role is to guide the design of the residence so it blends
in with its natural surroundings and is suitable for the particular lot.
Adhering
to these guidelines will not only protect, but will enhance, the value
of your property at Uwharrie Point. The mission of the ARB is to create
a community that is homogeneous with its natural lakefront surroundings;
a community that through its architecture expresses itself as a wonderfully
quiet, well kept, comfortable, appealing and very desirable area in which
to live.
Each
lot is different, therefore, it is essential that the design for your
new home be suitable for the property. The ARB advises you to seek professional
design and construction services prior to beginning the design process.
The services of a licensed architect and/or landscape architect to develop
and/or evaluate the design of your new home and its proper placement on
the lot is required by the Architectural Review Board. Your Professional
must review the selected design to ensure that it is well situated on
your lot with a properly designed site plan. The Professional must also
ensure that your home is designed to be in keeping with the style and
integrity of the Architectural Guidelines as set forth by Uwharrie Point.
The policy does not require your home to be designed by an architect.
It does require that the drawings, if not prepared by a architect be reviewed
and certified by an architect to be in compliance with the requirements
and intent of the ARB guidelines. Your professional will submit the Compliance
Form Letter (see Appendix A) at either the time of the Preliminary Design
Submittal or Final Construction Document Submittal for review by the Architectural
Review Board. The Board will then review the entire submittal package
and make the appropriate decision.
Simply
reading and understanding these guidelines will save you time and potential
frustration throughout the planning and building process. These guidelines
have been taken from the Covenants and Restrictions of Record to further
explain the vision of Uwharrie Point.
The
State Department of Health and Environmental Control, Montgomery County,
and Yadkin Inc. have jurisdiction over certain elements of the building
process at Uwharrie Point. The owner and his architect and builder are
solely responsible for compliance with these rules and regulations.
Authority
The
authority for the Architectural Review Board to approve or disapprove
site, architectural design and landscape plans as provided by the Declarations
of Covenants and Restrictions of the Uwharrie Point Community Association,
Inc., and the Declarations of Rights, Restrictions, Affirmative Obligations
and Conditions Applicable to all Property in Uwharrie Point. The ARB is
responsible for carrying out its duties on behalf of all members of the
Association for the benefit of the total community.
Members
The
Architectural Review Board is currently composed of three members: a registered
architect under contract by the Community Association, a licensed builder
and a resident member from the UPCA Board of Directors.
Meetings
The
Architectural Review Board meets the first and third Tuesday of each month
to review submitted plans. Submittals are due to the Uwharrie Point Community
Association (UPCA) office no later than 5 p.m. on the Tuesday prior to
the next scheduled meeting. Please contact the UPCA office at 336-461-5344
for the date of the next meeting.
Submittals
may be hand delivered or mailed to the UPCA office at:
Uwharrie
Point Community Association
Attn:
Architectural Review Board
1520
Uwharrie Point Parkway
New
London, NC 28127
ARCHITECTURAL
REVIEW BOARD POLICIES
Policy
Statement
Property
in Uwharrie Point is subject to certain restrictions as further detailed
in the Declarations of Covenants and Restrictions of the Uwharrie Point
Community Association, and the Declaration of Rights, Restrictions, and
the requirements contained in this Architectural Guideline Book.
The
ARB does not seek to restrict individual taste or preferences. In general,
its responsibility is to avoid harsh contrasts in the landscape and architectural
themes of Uwharrie Point, and to foster thoughtful design so that there
is harmony between residences. The ARB intends to be completely fair and
objective in the architectural review process and to maintain sensitivity
to the individual aspects of design.
Limitation
of Responsibility
The
primary goal of the ARB is to review the applications, plans, specifications,
materials, and samples submitted, to determine if the proposed structure
conforms in appearance and construction criteria with the standards and
policy set for by the Architectural Guidelines and the Declaration of
Covenants, Restrictions, Rights, and Obligations. The ARB does not assume
responsibility for the following:
- The structural adequacy, capacity or
safety features of the proposed improvement or structure.
- Soil erosion, uncompactible or unstable
soil conditions.
- Compliance with any or all building
codes, safety requirements, governmental laws, regulations or ordinances.
- Performances or quality of work of any
contractor.
Time
Limitations
After
the final approval by the ARB, the Builder must begin construction
within six months from the date of approval or forfeit all approvals.
In accordance with the Declaration of Rights, Restrictions, Affirmative
Obligations and Conditions, Part IV, paragraph 7(a): the exterior of each
house, dwelling unit, phase or group of Multiple Family dwelling units
and all other structures must be completed (i) within one year after the
construction of the same shall have commenced on all Single Family lots
and Patio Home sites, and (ii) within two years after the construction
of same shall have commenced on all Multiple Family Tracts, except where
such completion is impossible or would result in great hardship to the
Owner or builder due to strikes, fires, national emergency or natural
calamities. Houses and other dwelling structures may not be temporarily
or permanently occupied until the exteriors thereof have been completed.
Appeal
If
an submittal has been denied, or the approval is subject to conditions
which the owner wishes to challenge, the owner may request a hearing before
the ARB to explain his position and to answer any questions the ARB may
have. After the hearing, the ARB will review the presentations and discussion
and notify the owner of its final decision within ten (10) days of the
hearing. If the ARB stands by their first decision an denies the submittal,
the owner may request an appeal before the full UPCA Board of Directors
to explain his position and to answer any questions the Directors may
have. After the appeal hearing, the UPCA Board will review the information
and notify the owner of its final decision with ten (10) days of the hearing.
The final determination of the UPCA Board of Directors will stand as the
final decision.
Lot
Combinations and Subdivisions
In
accordance with the Declaration of Covenants, Restrictions, Rights, and
Obligations for the Uwharrie Point Community Association, the Developer
has sole approval rights for any and all lot combination or subdivision
requests.
FEES
ASSOCIATED WITH ARCHITECTURAL REVIEW
as
of January 1, 2008
Architectural
Review Fee
The
Uwharrie Point Community Association charges a non-refundable fee of
$750 for the review fee for new home construction submittals and addition/renovation
submittals in which the exterior of the home's appearance changes substantially
(i.e. foundation changes, roofs, etc.). The review fee is due with
the submittal. Checks should be made payable to "UPCA" with a notation
of the owner and site location.
Compliance
Deposit and Construction Agreement
The Construction Agreement must be signed by the owner and a $5,000.00
Compliance Deposit issued to UPCA prior to beginning new construction.
See Appendix H. Checks should be made payable to "UPCA". A signed copy and receipt will be given to the property owner. $4,000 of the compliance will be refunded to the owner once the construction and landscaping have been completed and the guidelines are met. $1000 will be applied towards the Reserve Fund as a road usage fee during the construction process.
For
Additions or Renovations that change the exterior of a home substantially,
the Construction Agreement must be signed by the owner and a refundable
$2,500.00 Compliance Deposit issued to UPCA prior to beginning construction.
See Appendix H. Check should be made payable to "UPCA". A signed
copy and receipt will be given to the property owner.
ARCHITECTURAL
REVIEW BOARD PROCESS FOR NEW CONSTRUCTION
The Architectural Review Board process consists of five steps. It is
essential that you understand the requirements of each step and that
every submittal is complete. If a submittal is incomplete, you will
not be allowed to proceed to the next step.
The
ARB policies require property owners, along with their Architect and/or
Contractor to be present for either the Preliminary Design submittal
or the Final Construction Document submittal. The ARB encourages property
owners to come to its meetings if you have questions or concerns. Meetings
are generally held on the first and third Tuesday of each month at 10:00
a.m. in the Sales Office at Uwharrie Point. Please call the Community
Association Office at 336-461-5344 to confirm the date and time of the
meeting and to be scheduled on the agenda. To be scheduled on the
agenda, submittals must be delivered to the Community Association Office
at least one week prior to the scheduled meeting.
The
five-step process is as follows:
1. Preliminary Design Submittal - Submit the following:
a.
Preliminary Design Approval Checklist (See Appendix A)
1. Owner Data
2. Site Plan minimum scale 1=30
3. Floor Plans & Elevations minimum scale 1/8=10
4. Architectural Certification (See Appendix A)
b. Color of exterior materials being considered (See Appendix C)
c.
Review Fee - This non refundable fee covers administrative costs
incurred by Uwharrie Point Community Association. In the event construction
does not begin within six (6) months of final approval or the residence
design or selected lot changes, a resubmission is required along with
the payment of the resubmittal fee. This non refundable fee is required
with the application for approval of primary construction or any subsequent
major construction. Contact the Community Association Office to confirm
the current Review Fee.
2. Construction Document Approval - Submit the following:
a.
Construction Document Approval Checklist (See Appendix A)
1.
Owner Data
2. Site Plan minimum scale 1=30
3. Floor Plans and Elevations minimum scale 1/4=
10
4. Material Samples
5. Architectural Certification (See Appendix A)
(if not submitted with preliminary design drawings)
b.
Compliance Deposit - A refundable Compliance Deposit is due at the
time of submittal to the Architectural Review Board. The money
is held at a local bank in a Uwharrie Point Community Association
interest bearing Escrow Account. The deposit is refundable once
the Architectural Review Board determines that the new home and landscaping
meets all of the architectural guidelines.
Please
contact the Community Association office to confirm the required deposit.
3.
Stake Out Review
a.
Notify the Community Association Office at 336-461-5344 when
the lot has been flagged for clearing and the house staked on the
lot.
i.
Each corner of the house should be clearly staked
with stake numbers corresponding to numbers on
the site plan.
ii. Area of clearing and driveway must be marked with
flagging tape.
iii. Owner/Contractor must arrange for an on-site,
pre-construction meeting with the Community Association Manager
before lot clearing begins.
Please call the Community Association office at
336-461-5344 to arrange the site inspection.
b.
Final approval for construction will be given if steps i-iii have
been followed. ARB member must also approve:
All erosion control measures
Additional tree removal
4.
Landscape Plan Submittal - Submit the following:
a.
Landscape Plan Submittal Checklist (See Appendix A)
1.
Owner Data
2. Landscape Plan minimum scale 1 =20
3. Plant List
4. Lighting Plan and Spec Sheet
5.
Final Compliance Review
a.
At completion of construction the ARB must be notified for the
final compliance inspection to verify that the home and landscaping
were completed according to the approved construction and landscaping
documents. You may schedule the final compliance inspection by calling
the Community Association Office at 336-461-5344.
b.
If anything is found to be non-compliant, the deposit is held until
the issues are corrected. Once the owner is given advance notification
and does not correct the non-compliant issues within a specified time
frame the board may contract to have the work completed and use the
compliance deposit to pay for the work. After all work is completed,
the compliance deposit will be refunded less any administrative fees
and costs required to correct the deficiencies. In the event,
the compliance deposit does not cover the cost of work, additional
expenses will be billed to the owner and will be payable within 30
days.
c.
Compliance Letter will be sent to the owner.
d.
Compliance Deposit will be refunded upon the issuing of the
Compliance Letter, less any deductions required to correct deficiencies.
ARCHITECTURAL
REVIEW BOARD PROCESS FOR ADDITIONS AND RENOVATIONS
The Architectural Review Board process for additions and renovations
consists of four steps. It is essential that you understand the requirements
of each step and that each submittal is complete. If a submittal is
incomplete, you will not be allowed to proceed to the next step.
The
ARB requires property owners, their Architect and/or Contractor to be
present for the submittal. The ARB encourages property owners to come
to its meetings if you have questions or concerns. Meetings are generally
held on the first and third Tuesday of each month at 10:00 a.m. in the
Sales Office at Uwharrie Point. Please call the Community Association
Office at 336-461-5344 to confirm the date and time of the meeting and
to be scheduled on the agenda. To be scheduled on the agenda, submittals
must be delivered to the Community Association Office at least one week
prior to the scheduled meeting.
The
four-step process is as follows:
1.
Preliminary Design/Construction Document Submittal - Submit the following:
a.
Preliminary Design/Construction Document Approval Checklist
for Additions and Renovations (See Appendix A)
1.
Owner Data
2. Site Plan minimum scale 1 =30
3. Floor Plans & Elevations minimum scale 1/4 =
10
4. Material Samples
5. Submittal Fee and Compliance Deposit
b.
Review Fee - This non-refundable fee covers administrative costs incurred
by Uwharrie Point Community Association. In the event construction
does not begin within six (6) months of final approval a resubmission
is required and the submission fee must be paid again. This non refundable
fee is required with application for approval of construction or any
subsequent major construction. Please contact the Community Association
Office to confirm the current fee.
c.
Compliance Deposit - A refundable Compliance Deposit is due at the
time of submittal to the Architectural Review Board. The money
is held at a local bank in a Uwharrie Point Community Association
interest bearing Escrow Account. The deposit is refundable once
the Architectural Review Board determines that the new home and landscaping
meets all of the architectural guidelines.
Please
contact the Community Association office to confirm the required deposit.
2.
Stake Out Review
a.
Notify the ARB when the lot has been flagged for clearing and
the addition staked on the lot.
i.
Each corner of the addition should be clearly staked
with stake numbers corresponding to numbers on
the site plan.
ii. Area of clearing and driveway, if applicable, must be
marked with flagging tape.
iii. Owner/Contractor must arrange for an on-site,
pre-construction meeting with the community association manager
before clearing begins. Please call the Community Association office
at
336-461-5344 to arrange the site inspection.
b.
Final approval for construction will be given if steps i-iii have
been followed. ARB member must also approve:
All erosion control measures
Additional tree removal
3.
Landscape Plan Submittal - Submit the following:
a.
Landscape Plan Submittal Checklist (See Appendix A)
1.
Owner Data
2. Landscape Plan minimum scale 1 = 30
3. Plant List
4. Lighting Plan and Spec Sheet
4.
Final Compliance Review
a.
At completion of construction the ARB must be notified for final compliance
inspection to verify that the addition/renovation and/or landscaping
were completed according to the approved construction and landscaping
drawings. You may schedule the final compliance inspection by calling
the Community Association Office at 336-461-5344.
b.
If anything is found to be non-compliant, the deposit is held until
the issues are corrected. Once the owner is given advance notification
and does not correct the non-compliant issues within a specified time
frame the board may contract to have the work completed and use the
compliance deposit to pay for the work. After all work is completed,
the compliance deposit will be refunded less any administrative fees
and costs required to correct the deficiencies. In the event,
the compliance deposit does not cover the cost of work, additional
expenses will be billed to the owner and will be payable within 30
days.
c.
Compliance Letter will be sent to the owner.
d.
Compliance Deposit will be refunded upon the issuing of the Compliance
Letter, less any deductions required to correct deficiencies.
LOT
POTENTIALS AND CONSTRAINTS
Due to each lot's
varying factors that affect its development requirements, it is essential
that you understand all factors of your property and their effect on
adjoining properties, both developed and vacant, before you design/choose
a floor plan and attempt to locate your home.
Listed
below are several lot positive and constraining factors affecting the
development of property. Some Governmental Regulations which may be
applicable to the method of development are also referenced. It is beyond
the scope of the ARB to be aware of all factors and regulations which
pertain to lot development for many varying site conditions present
at Uwharrie Point. It is ultimately the Property Owner(s) responsibility
for development of his site in conformance with Local, State and Federal
laws and other regulations. In an effort to assure that all Property
Owner(s) are aware of these varying factors, all plans submitted to
the ARB must include a signed copy of the "Acknowledgement Statement"
included in Appendix A of this document.
Other
requirements exist within Declaration of Covenants and Restrictions
of Record, and the Uwharrie Point Architectural Guidelines and should
be reviewed for each particular lot.
1.
Views: While the views offered by your lot should be maximized,
please keep in mind that your new home becomes a part of other peoples
view. In most cases, this will require consideration in developing
your plans and may affect the location of your home. The ARB reserves
the right to approve, reject, and/or modify the house location, landscaping,
driveways, etc. if the board believes it will grossly affect an adjacent,
existing, or future home.
2.
Slopes/Drainage: The slope of your lot may enhance certain view
orientations and is an important factor in developing or selecting
a house design. A home designed to accommodate the slopes of your
lot will minimize the destruction of trees, natural vegetation, and
existing natural terrain which attracted you to Uwharrie Point.
The
lot Owner is responsible for issues related to surface water run-off
both during and after completion of construction activities. Development
plans for all sites should address surface water routing issues from
both upstream areas as well as the location of surface water discharges
to downstream properties. The party responsible for plan preparation
should determine the area above their development site contributing
surface water run-off, and design their surface water conveyance systems
to accommodate run-off from existing and future development. Should
the current site adjoin undeveloped lots, the plan preparer should
attempt to anticipate future development in choosing the planning
in the design and placement of surface water conveyance structures
when the sequence of lot development is not known. It is not
the responsibility of the ARB to assess legal issues relating to the
Property Owner's legal rights of development of their site, and its
effect on the legal rights of those Property Owners upstream and downstream.
However, in an effort to assist Property Owners in understanding the
importance of these issues, we have included in Appendix F, a Memo
from the Land Quality Section of the N.C. Department of Environment
and Natural Resources dated January 6, 1988, summarizing legal issues
related to surface water run-off. This is offered only as a reference.
Property Owners and plan preparers are encouraged to obtain their
own legal opinions related to issues on their individual sites.
Sites
disturbing more than one acre of land during development activities
must obtain approval of an Erosion Control Plan for their site from
the Land Quality Section and Division of Water Quality of the N.C.
Department of Environment and Natural Resources. Although sites disturbing
less than one acre are not required to obtain a permit, they must
still comply with all applicable laws and standards. The Property
Owner(s) is responsible for compliance and provision of erosion control
devices and plans.
Applicable
requirements and standards are available from the State offices and
should be applied to all sites developed within Uwharrie Point.
3.
Access: In most cases, the most practical route will determine
driveway access to your home. Meandering driveways add interest
to the approach and can help save trees. Please do not underestimate
the damage caused by grading and utility installation. Large trees
damaged during construction often times die within a few years and
the cost of removal may be significant. Trees at Uwharrie
Point are very shallow rooted and rainfall on steep slopes causes
massive erosion. Therefore, attention paid to a properly graded plan
is essential to protecting your investment, protecting trees and their
root zone during construction.
4.
Setbacks: The minimum setbacks listed below have been established
for lots at Uwharrie Point. Southpoint and Millingport have different
setbacks than the ones listed below. See Appendix D to determine the
particular setbacks for Southpoint and Millingport. In some cases,
the ARB has determined that larger setbacks are necessary to protect
the character of Uwharrie Point. Suggested building envelopes have
been determined for each lot within Southpoint and are also included
in Appendix D. The legal recorded setbacks will determine
the maximum perimeter location of your home and must be shown clearly
on your submittal.
Note:
Lakefront setbacks in Allenton Ferry, Pennington Ferry and Glenbrook
Springs are measured from the rear property line (545 ALCOA Datum,
514 USGS Datum). In these three neighborhoods, the minimum rear yard
setback as indicated on the recorded plat is 40 ft. from the rear
property line. Lakefront setbacks in Southpoint, Porters Glen, Pattersons
Bridge, Long Cove and Millingport are measured from normal pool, which
is described as the 541 contour line (541 ALCOA Datum, 510.3 USGA
Datum), not the rear property line.
5.
Minimum Square Footage: Homes at Uwharrie Point must meet the
minimum square footage requirements below.
Lake Lots - 2,000 Square Feet
Lake View Lots - 1,800 Square Feet
Golf Course Lots - 1,800 Square Feet
Interior Lots - 1,600 Square Feet
Millingport - 1,200 Square Feet (all lots)
Swift
Island - 1,800 Square Feet (all lots)
Southpoint - 2,500 Square Feet (all lots)
6.
Existing Adjacent Homes: Existing adjacent homes may constrain
the location, choice of architecture, materials, and landscape screening
of your home. The corners of all existing structures must be clearly
shown on your site plan submittal.
7.
Flood Damage Prevention Ordinance: Effective February 2, 1999
the Montgomery County Commissioners adopted a Flood Damage Prevention
Ordinance which states:
1.
The flood hazard areas of Montgomery County are subject to periodic
inundation which may result in loss of life, property, health and
safety hazards, disruption of commerce and governmental services,
extraordinary public expenditures of flood protection and relief,
and impairment of the tax base, all of which may adversely affect
the public health, safety, and general welfare.
2.
These flood losses may be caused by the cumulative effect of obstructions
in flood plains causing increases in flood heights and velocities,
and by the occupancy in flood hazard areas by uses vulnerable to
floods or hazardous to other lands which are inadequately elevated,
flood proofed, or otherwise unprotected from flood damages.
Due
to the adoption of this ordinance, each homeowner of lakefront property
must contact the Montgomery County Building Inspections Department
to properly evaluate the status of their property in relation to the
adopted ordinance.
8.
Tree Removal: No trees measuring 6 or more in diameter at
a point 2 above ground level may be removed without the prior
written approval by the company. Approval for the removal of trees
located within 10 of the main dwelling or accessory building
or within 10 of the approved site for such building will be
granted unless such removal will substantially decrease the beauty
of the property. Clearing limits shall not exceed 10 outside
of the building envelope or 5 beyond the limits of the driveway.
Any variations to this policy must be discussed with a appointed representative
for the ARB.
Any lot owner who has receive permission from APGI (Yadkin) Inc. to
remove trees within the APGI (Yadkin), Inc. monitored 100 setback
from the lakes edge, must also receive prior approval from the Architectural
Review Board before proceeding with tree removal within this area.
9.
APGI (Yadkin), Inc.
Bald
Eagle Management Plan Setback Rule - All building must be set
back
100 feet from the waters edge, a well will be allowed in the
100-foot setback to the extent installation does not require removal
of any 6-inch or greater diameter tree. The diameter of the tree
will be measured one foot above the ground level.
A
20-foot construction zone around a dwelling will be permitted to
intrude into the 100-foot setback. The portion of the construction
zone intruding into the setback must be revegetated upon completion
of construction.
Building is interpreted to be a verb and includes, but is not limited
to, the footprint of the house, roof overhangs, decks, porches,
patios, cantilevered decks, stairs, posts, columns, fences, retaining
walls, landscaping walls, and gazebos.
Variances
will be granted only when a lot is unbuildable. Unbuildable means
the inability to build the minimum size house, as required in the
developments restrictive covenants, behind the 100-foot setback.
Vegetative
Plantings Planting of any vegetation including
but not limited
to shrubs, hedges, flowering plants, native vegetation, etc.
is prohibited in the reservoirs, and on the APGI (Yadkin)-Managed
Buffer without written permission from APGI (Yadkin).
MINIMUM
BUILDING STANDARDS
The following minimum standards have been established to maintain a
level of quality for home construction at Uwharrie Point. Other standards,
which regulate the type and use of materials and measures for environmental
protection, appear in sections V and VI of the guidelines. In each case,
the property owner must adhere to the North Carolina Building Codes
and Montgomery County regulations.
Enforcement
Procedure:
Any
guideline or standard set forth that is not adhered to and is found
to be in violation of the stated requirements, may subject the owner
to a fine or authorized removal of the non-compliant item at the cost
of the owner.
1.
Housing Styles
The
following housing styles are unacceptable:
a. Log Homes
b. A Frame style homes
c. Southwestern Adobe
d. Mediterranean
e. Spanish
f. Adobe
g. Octagonal homes
h. Structures with flat roofs
2.
Foundations and Chimneys
a.
Foundation material must be brick, stone or stucco tinted to
complement the exterior house material.
b.
Wood sided chimneys are strongly discouraged.
3.
Decks and Porches
a.
Decks and handrails must be architecturally designed with
appropriate skirting and/or boxing of posts or structural members.
b.
All pressure treated handrail and deck assemblies on the front,
rear, and side elevations must be painted or stained with approved
colors once the wood has cured.
c.
Decks and porches must be underpinned with stained or painted
lattice. Landscaping in certain situations will be appropriate.
d.
Deck support posts must be of a thickness and proportion commensurate
with the size of the house and the height of the deck above ground.
e.
Deck steps must be a closed riser configuration if the underside
of the
deck beyond, not finished space, is visible through the deck steps.
f.
Front and/or porch steps must be a closed riser configuration.
4.
Roofs
a.
Roof slopes less than 6/12 are discouraged but will be reviewed
on an
individual basis.
b.
Approved roofing materials:
Fiberglass/Asphalt Dimensional/Architectural type shingles.
Architectural Standing Seam metal roofing (not tin).
Wood Shakes: Hand split cedar, minimum 1/2 to 3/4
thickness (medium) 24 long with 10 exposure.
5.
Garages/Accessory Buildings and Driveways
a.
Detached garages may be allowed as long as they do not qualify as
a
residence. No structure shall be erected, altered, placed or permitted
to remain on a lot other than one detached single family dwelling
and one small one story accessory building which may include a detached
private garage provided the use of such accessory building does
not overcrowd the property as determined by the ARB and provided
that such building is not used for any activity normally conducted
as a business. Such accessory building may not be constructed prior
to the construction of the residence. A guest suite or like facility
without a kitchen may be included as part of the main dwelling or
accessory building on any single family lot, however, each site
may be not be rented or leased except as part of the entire premises
including the main dwelling, and provided, however, that such suite
may not result in overcrowding the property, as determined by the
company in its sole and uncontrolled discretion.
b.
Garage doors facing the street are discouraged but will be reviewed
on
an individual basis according to the size and topography of the
lot.
c.
Garage doors must be installed.
d.
Driveways must be a hard surface material consisting of concrete,
which
may be tinted or painted; asphalt, brick pavers, stone pavers, exposed
aggregate concrete, etc. See Appendix C.
e.
Carports are strongly discouraged and will reviewed on an individual
basis.
6.
Antennas and Satellite Dishes
a.
Except as specifically approved by the ARB in each instance, no
television disc or antenna, radio receiver, radio sender or other
similar device shall be attached to or installed on any Residential
property or on the exterior portion of any building or structure
on
any Residential Property except as follows:
Should
C.A.T.V. services be unavailable and good television
reception not be otherwise available, the owner may make
written application to the ARB for permission to install a
antenna.
b.
18 or smaller satellite dishes are permitted and must be installed
in an
unobstructive manner and screened from view as much as possible
with landscaping or other appropriate material. Before installation
you must meet with a representative from the Community Association
to determine placement of the dish. Please call the Community Association
Office at 336-461-5344 for an appointment to visit the site.
7.
Basketball Goals
The
request to install a basketball goal on individual homeowner's property
will be reviewed by the board on an individual basis. A request
should be submitted to the ARB for review prior to installation.
The request must include a site plan with the proposed location
of the basketball goal indicated. The request must also include
the type (movable or permanent), size, etc. of the basketball goal.
The ARB requires that the backboard be white or glass with
a black pole and orange or black rim.
The
board may also require the installation of additional landscaping
material around the back of the goal to prevent stray shots from
going onto adjacent property.
8.
Play Equipment, Treehouses, etc.
All
play equipment shall be placed so that it is unobtrusive and within
setback lines and placed so as to minimize visibility from the street,
adjacent homes, lake or golf course. Play equipment and treehouses
are considered structures requiring full approval by the ARB.
9.
Retaining Walls and Fencing
a.
Retaining walls should be constructed of the house foundation material
if
attached to the house and should not be located within the rear
setback.
b.
Railroad tie, landscape timber, and/or dry stack stone retaining
walls are
only permitted in rear setback if they are less than 24 high
and no
footing excavation is required. Concrete block walls with footings
are
not allowed.
c.
Fencing around homes is strongly discouraged and will be considered
on
an individual basis.
10.
Street Side Gates
Street side gates are not allowed in Glenbrook Springs, Pennington
Ferry,
Allenton Ferry, Pattersons Bridge, Swift Island, Yadkin Falls,
Lassiter Mill, Whitley Mill, Candor Oaks, and Millingport, due to
the close proximity of the driveways within those neighborhoods.
Street side gates in all other neighborhoods will be reviewed on
a case by case basis.
11.
Piers
a.
Any pier structure that is above the 545 contour line (rear property
line)
(545 ALCOA Datum, 514 USGS Datum) must be submitted to the ARB for
design approval.
b.
Complete drawings, including plans and elevations, must be submitted
for
the pier structure.
c.
Structure must be all wood. Concrete block is not permitted.
d.
No grading is allowed. Clearing is limited to 5 outside of
proposed
structure and decking.
e.
Piers should be in compliance with APGI (Yadkin), Inc. pier guidelines.
See Appendix F. You may receive a copy of the current guidelines
by
calling APGI (Yadkin), Inc. at 704-422-5644.
f.
Structure must be open.
g.
Railing must match those on the house.
12.
Screening of Service Areas
All service areas must be screened with a hard surface wall approximately
three (3) feet high, or constructed of wood siding, brick, stone
or stucco to match the house. The service area can also be screened
with heavy landscaping.
13.
Patios
a.
Grass terraces are allowed, so long as the turf grass does not extend
any
closer than 50 to the lakes edge.
b.
Any hard surface set in a sand bed, i.e., flagstone, interlocking
pavers, brick pavers, etc. is permitted within the setback.
c.
Any permanent hard surface patio, i.e., concrete w/flagstone, concrete
w/interlocking pavers, brick pavers, etc. attached or detached to
the house are permitted. Those that extend into the setback whether
attached, or detached to the house are not permitted.
14.
Paint Colors
a.
Paint and stain colors must be submitted and approved for new home
construction. If an owner wants to change a house color the new
color
must be submitted for approval.
b.
One coat of semitransparent stain on wood siding is not allowed.
15.
Windows
Metal-clad or Vinyl clad windows are permitted. Metal-framed windows
are not permitted.
16.
Dog Houses
a.
The dog house must be hidden from view with appropriate landscaping
or
screening.
b.
If the dog house is not screened from view it must compliment the
house
by matching construction materials, i.e., siding, roofing, etc.
17.
Flags
American Flags:
a.
American flags no larger than 15 square feet (3'x5') may be displayed
on homes using standard flag mounting hardware.
b.
American flags must be displayed in good condition and maintained
to ensure that they are clean and neat in appearance.
c.
UPCA reserves the right to require flags to be repaired, cleaned
or replaced if not suitable for display.
Other
Flags:
a. Although
not encouraged, display of flags other than the American flag within
the community is allowed.
b.
Decorative flags no larger than 15 square feet (3'x5') may be displayed
on homes to reflect special occasions or time of the season.
Standard flag mounting hardware must be used.
c.
Flags must be displayed in a manner sensitive to neighboring properties.
d.
Decorative flags must be displayed in good condition and maintained
to ensure that they are clean and neat in appearance.
e.
UPCA reserves the right to require flags to be repaired, cleaned
or replaced if not suitable for display.
f.
Any flag deemed inappropriate by UPCA must be removed immediately
upon notification.
Mailbox
Flags:
a.
An American flag no larger than 8" x 12" may be displayed
above the mailbox on the front of the post above the mailbox, or
on the front of an approved 911 post using standard flag mounting
hardware.
b.
Only one (1) American flag per mailbox or post is permitted and
the staff may not be longer than 12".
18.
Uwharrie Point Water and Sewer System
Handy Sanitary District, a State authorized utility began full operation
as owner and operator of the Uwharrie Point Water and Sewer Systems.
The water tap fee and sewer tap fee must be paid directly to Handy
Sanitary District before construction begins. Handy Sanitary District
installs all taps. These fees could change without notice. You may
contact Handy Sanitary District by calling 336-859-2553 or stop by
the Handy Sanitary office at 17403 South NC Hwy. 109 in Denton.
19.
Grinder Pumps
Grinder pumps are not allowed within the state mandated natural vegetative
buffer which includes the first 30 from the lakes edge. In Millingport,
Pennington Ferry, Allenton Ferry, and Glenbrook Springs grinder pumps
within the first 50 of the lakes edge are strongly discouraged
but may be allowed if there is no other option for pump placement.
In all other waterfront neighborhoods grinder pumps are not allowed
within 100 of the lakes edge.
20.
Wells
Wells
may be installed for irrigation purposes only. If an owner wants
to install an irrigation well, the placement and method of screening
the well pump must be submitted for approval.
21.
Firepits, Decorative Features, etc.
Firepits
and/or decorative features such as sculptures, fountains, statuaries,
etc. shall be permitted on a case by case basis and must be submitted
for approval prior to installation.
22.
Exterior Lighting
All
exterior lighting must be approved by the ARB. Low voltage and down
lighting is encouraged to reduce glare. Colored lights are prohibited.
23.
Mailboxes (also 911 posts)
The
initial purchase of a new mailbox structure will be the responsibility
of the homeowner. The owner will need to notify the Community Association
to order a new mailbox. If a homeowner or contractor damages a mailbox,
the owner/contractor will be responsible for the replacement costs.
Once
the initial mailbox is purchased by the owner, it will be the responsibility
of the Uwharrie Point Community Association to maintain and replace
mailbox structures within the community.
Mailbox
inspections will be conducted by UPCA on an on-going basis. Work will
be performed once the appropriate maintenance is identified. This
will include maintenance for individual mailboxes, mailbox posts,
number plates, and nameplates. Maintenance will include removal of
peeling or flaking paint; painting; removal of dirt, mildew, algae;
straightening post if not plumb, (i.e. leaning or crooked); replacing
mailboxes, posts, nameplates and number plates after the initial purchase.
Note:
Replacement nameplates, number plates, posts, and mailboxes must match
the existing standards set forth by UPCA and must be obtained through
the Community Association Office.
24.
Pools, Spas
No
aboveground pools or inflatable bubble covers will be allowed. In-ground
pools and spas will be reviewed on a case-by-case basis and should
relate architecturally to the home and other structures in their materials
and detailing.
25. Landscaping Requirements
The goal of the ARB is to ensure each home blends into its surroundings and reflects the overall quality of the landscaping displayed throughout the community. The landscape design shall be appropriate and adequate for the size, shape, topography, and location of the lot and shall compliment the design of the dwelling as well as the context of the neighborhood. The density and size of plantings around each home should reflect a semi-mature image at the time of installation.
A. OBJECTIVES
The purpose of landscaping is to:
- Preserve the native vegetation of the community and ensure adequate and appropriate replacement of vegetation lost during construction.
- Soften the vertical elements, corners, solid wall areas, foundations, porches, decks, and other architectural elements with foundation plantings in scale with the structure.
- Screen service areas, equipment enclosures, and parking areas.
Blend with the existing natural vegetation and landscape of adjacent properties.
B. RECOMMENDATIONS
a. Even though a landscape plan may be approved by the ARB as drawn, the final approval can not be given until installation occurs and the objectives in Item A above have been achieved. Due to many varying factors that may affect the overall view of the landscape installation (plant sizes, elevations and contours, adjacent views, etc.) an on-site consultation visit may be scheduled with the Community Manager to view the plant material placed around the home before it is planted or at some point during the installation process in order to determine problem areas or special concerns. Please note that the consultation visit is on an advisory basis and does not take the place of the final compliance approval by the ARB.
b. Plants should be installed in a staggered design where possible rather than in a straight row in order to provide depth, interest and also more room for growth and screening at maturity.
c. Plants native to the area shall be utilized as much as possible, for these plants are best adapted to the conditions of Uwharrie Point. Native plants tend to be less difficult to establish and they maintain the natural character of the area. Plant selections should be made that are least susceptible to deer damage. Refer to the attached recommended list of plants.
d. Large lawn areas are discouraged for it is the intent of the guidelines to preserve as much of the natural vegetation as possible.
e. All street right-of-ways must be returned to pre-construction condition once the project is completed. This must include removing compacted soil, adding fresh soil, seed and straw. It is recommended, but not required, that street right-of-ways be planted with sod and irrigated for a continuous landscape treatment at the street, particularly if it is destroyed during construction.
C. LANDSCAPE PLAN SUBMITTAL REQUIREMENTS (for new installations and additions)
a. Landscape Plans must be prepared by a qualified Landscape Designer or Landscape Architect. It is strongly suggested that owners use a registered Landscape Contractor to execute the initial installation of landscaping. Under any circumstances, installations must be executed as approved by the ARB
b. Landscape submittal packages must include the appropriate completed submittal forms (i.e. checklist, change request form); drawings, plant list, lighting plan and spec sheet. Submittal forms can be found in Appendix A. A sample landscape drawing and plant list are located in Appendix B.
D. PLANTING SPECIFICATIONS
a. Foundation plants: Evergreen foundation plantings are required along the entire foundation of a home and provide a backdrop to deciduous and flowering shrubs. The minimum size of foundation plantings at time of installation must be a plant with a minimum spread of 18”-24” wide and which is at least half the height of the foundation wall at floor level. Larger plant material (min 3-4’ ht.) shall be planted against the section of building walls which do not have windows or trim details. Plants should be spaced with consideration of mature width and height but also to provide a full, semi-mature feel at time of planting. Evergreen shrubs should be chosen that could be placed at approximately 30”-36” on center and should be full enough at planting for a minimum of open space between the branches.
b. Screening HVAC units, service areas and other utility areas: It is recommended that service areas be screened using hardscape materials to match the exterior of the home (i.e. lattice, wood, brick, stone, etc.). However, evergreen plants may be installed to screen these areas. Plants should be spaced so they are touching when installed. Plant height must be at least to the top of the HVAC unit, service area or utility area and a fully screened effect must be achieved at the time of installation. Plant material should be selected for these screening objectives with regard to the mature height of the plant.
c. Screening Garage Openings: A min 3ft landscape buffer strip is required from the outside edge of the driveway to the property line when side entry garages are proposed. A row of evergreen plants a minimum height of 5 ft. shall be planted within this landscape buffer to screen the side entry garage opening from view to adjacent homes. Plants shall be spaced so they are barely touching at time of installation to ensure a solid green buffer within a year of growth.
d. Screening below decks attached to residences with no living space below (crawl spaces): The architectural guidelines suggest lattice be applied to screen the underside of decks. As an alternate to the lattice, evergreen plants may be installed. The plants shall be installed at a height which is at least half the height of the space between finished grade and the deck surface. When decks are visible from the golf course or other prominent views, the plant height will be required at two-thirds the height of the space between finished grade and deck surface. The sides of plants shall be almost touching so that a full line of plants will be achieved within a year of growth.
e. Shade and Canopy Trees: Revegetation will be required to restore over time the natural forest canopy lost during construction. The minimum tree size for hardwood trees is 2 ½” caliper, 12’ – 14’ for those measured by height; and for evergreen trees the height minimum is 6’-8’. Specific requirements will be reviewed on a lot-by-lot basis.
f. Lawn, Groundcover and Mulch: Lawn, groundcover and or mulch areas must be established to control erosion in conformance with the Environmental Rules and Regulations found in Section VI of the guidelines. Disturbed slopes steeper that 3:1 shall be stabilized with ground cover and/ or slope plantings and mulch.
E. PHASED INSTALLATIONS
A phased landscape plan may be approved only if all objectives stated above are met by the first phase landscape installation. If the landscape plan is phased, the plan must clearly indicate the first phase of installation. The approval for future phase(s) expires after a 24 month time limit. Once 24 months has passed, future landscape phases must be resubmitted for approval by the ARB.
Revised 8/07
PLANTS
LEAST SUSCEPTIBLE TO DEER DAMAGE AT UWHARRIE POINT
The following list represents recommended plants by the North Carolina
Wildlife Resources Commission that have shown minimal or no browsing
by deer. The animals tastes and habits change and this list is
not fool proof. However, homeowners have experienced good success with
many of these plants. The Architectural Review Board makes no guarantees
regarding the appeal of these plants to the resident deer population.
Annuals
Snapdragon Antirrhinum
Begonia Begonia sempervirens
Morning Glory Ipomea
Lobelia Lobelia erinus
Scented Geranium Pelargonium spp.
Salvia Salvia, all varieties
Marigold Tagetes sp.
Common Zinnia Zinnia elegans
Narrowleaf Zinnia Zinnia linearis
Perennials
Anemone Anemone sp.
Butterfly Weed Asclepias tuberosa
Astilbe Astilbe
Butterfly Bush Buddleia davidii
Shasta Daisy Chrysanthemum x supurbum
Lily-of-the-Valley Convallaria majus
Coreopsis Coreopsis
Pinks Dianthus
Bleedingheart Dicentra
Foxglove Digitalis spp.
Purple Coneflower Echinacea
Lenton Rose Helleborus
Coral Bells Heuchera
Candytuft Iberis sempervirens
Beebalm Monarda didyma
Daffodils Narcissus sp.
Balloon Flower Platycodon
Woody Shrubs, Groundcovers, and Trees
Maples Acer
Barberry Berberis, all varieties
Birch Betula
Common Boxwood Buxus sempervirens
American Beautyberry Callicarpa dichotoma
Flowering Quince Chanomeles japonica
Summersweet Clethra alnifolia
Cotoneaster Cotoneaster, all varieties
Hawthorne Crataegus
Deutzia Deutzia
Burning Bush Euonymus alatus
Beech Fagus
Carolina Jessamine Gelsemium sempervirens
Fosters Holly Ilex attenuata
Chinese Holly Ilex cornuta, sp.
Japanese Holly Ilex crenata
Inkberry Holly Ilex glabra
Dwarf Yaupon Holly Ilex vomitoria, recovers well
Juniper Juniperus, all varieties
Crape Myrtle Lagerstroemia indica
Variegated Privet Ligustrum sinense
Ligustrum Ligustrum sinensis
Monkey Grass Liriope, all varieties
Southern Magnolia Magnolia grandifolia
Dawn Redwood Metasequoia
Ornamental Grass Miscanthus, various varieties
Nandina Nandina, all varieties
Japanese Andromada Pieris japonica
White Pine Pinus alba
Firethorn Pyracantha, all varieties
Spirea Spirea
Stewartia Stewartia
Arborvitae Thuja orientalis
Hemlock Tsuga canadensis
Viburnum Viburnum, deciduous varieties
Periwinkle Vinca minor
The
above is a partial list at best. There are numerous other plants which
may be well suited for installation here on the property. As the ARB
is made aware of these plants they will be added to the list. The following
is a list of those plants that have been severely damaged by deer on
the property.
Heavy
Browsing
Camellia Camellia, all varieties
Cleyera Cleyera japonica
English Ivy Hedera helix
Daylilies Hemerocallis hydrida
Hosta Hosta, all varieties
Oakleaf Hydrangea Hydrangea quercifolia
Carissa Holly Ilex cornuta carissa
Nellie R Stevens Holly Ilex x Nellie R Stevens
Honeysuckle Lonicera sempervirens
Leucothoe Luecothoe popufolia
English Laurel Prunus laurocerasus
Rhododendron Rhododendron hybrida
Azeleas Rhododendron hybrida, all varieties
Roses Rosa hybrida
Viburnum Viburnum, evergreen varieties
Pansies Viola, all varieties
BUILDING
MATERIALS AND USES
The ARB at Uwharrie Point highly recommends the use of indigenous materials.
Using this type of material will help promote the character of Uwharrie
Point and will also enhance the value of your home.
Appendix C contains specification sheets with pictures of building materials
which are characteristic of architecture in Piedmont North Carolina.
While other materials may be permitted, they are generally discouraged
and may not be allowed in certain situations. Some combinations, or
the use of many different materials, may also be prohibited.
Following
are the materials that are or are not permitted. The Architectural Review
Board is open to review new products on an individual basis.
1.
Materials Permitted:*
a.
brick
b. wood board siding
c. shingle siding
d. stone
e. cultured stone, cultured brick
f. cement plaster stucco or EIFS (Dri-vit or Sto products)
g. cementitious siding (Hardiplank)
h.
vinyl lattice (used for underpinning around porches, decks, steps)
i.
composite materials (i.e. Azec, Fiberon, Miratec, etc.)
2.
Materials Not Permitted:
**a.
vinyl or aluminum siding, soffitt, paneling or trim
b. panelized (plywood) wood siding (i.e. T1-11 siding)
c. hardboard or particle board siding (i.e. masonite siding)
d. tile siding
e. solid vinyl windows
*2
x 2 sample of a proposed material may be required if ARB deems
necessary.
**Vinyl
and/or aluminum siding, soffits, paneling, or trim are materials which
are not
allowed at Uwharrie Point. At the present time the Board has not found
a
desirable vinyl or aluminum material that is acceptable.
ENVIRONMENTAL
RULES & REGULATIONS
Uwharrie Point is dedicated to the exercise of environmental sensitivity
in all aspects of development. It is of utmost importance, not only
to the residents of Uwharrie Point but also to others who frequent the
lake and to the wildlife which inhabit the area, that the environment
and water quality of the lake be protected. With a development the size
of Uwharrie Point, changes in the overall environment are inevitable.
However, with careful stewardship and cooperation from everyone involved,
these impacts may be minimized so as not to spoil the beauty and quality
of the areas bountiful resources.
The area around the lake is protected by the State of North Carolinas
Watershed Protection Act which was established in 1992 and is administered
by the County. The watershed act requires a 30 natural vegetative
buffer along the lake edge to protect the lake and leave a forested
shoreline for the benefit of wildlife. Much of the property in this
30 buffer is owned and controlled by Alcoa Power Generating, Inc.
(APGI) Yadkin Division, the lake owner. Any activity in this
area must comply with the 30 buffer requirements and with APGI
(Yadkin) Inc., requirements. Any activity on APGI (Yadkin) Inc., property
must be approved in advance by APGI (Yadkin). You may contact them at
1-888-886-1063 to schedule a appointment and obtain the necessary permits
prior to the commencement of any work.
One of Uwharrie Points major concerns is the excessive use of
fertilizers, pesticides and herbicides on household lawns because of
its effects on the environment and the potential for water quality degradation.
Excessive or improper use of these substances can result in adverse
environmental impacts when carried into the lake or unintended areas
by storm water run-off.
The ARB discourages the use of large turf grass areas on individual
lots. In keeping with Uwharrie Points policy of limited tree removal,
we urge that non-turf groundcovers or mulch be used as much as possible
so that fertilizer, pesticide and herbicide applications will be minimal.
The following requirements must be met if turf grass areas are established
on individual lots.
a. No turf grass areas within 50 of the lakes edge at
normal full reservoir elevation.
b.
No landscaping beyond the property line of lot, or on APGI (Yadkin),
Inc.
property or within the 30 natural vegetative buffer without
a permit from APGI (Yadkin), Inc.
c.
Adherence to recommended fertilizer application rates.
A
summary of the Uwharrie Point Environmental Rules and Regulations follows.
Please refer to Appendix G for more information.
a.
If insecticides or herbicides are used, please follow application
instructions
carefully and never use if rainfall is expected within 48 hours after
application.
b.
Hazardous household materials may never be emptied on the ground or
buried at
Uwharrie Point. (i.e. paint, pesticides, motor oil, etc.)
c.
Failure to comply with these policies will be considered a violation
of the
Declaration of Rights, Restrictions, Affirmative Obligations
and Conditions Applicable to All Property at Uwharrie Point.
Violators will be dealt with under the terms and conditions outlined
in Part V in this Declaration.
APPENDIX
Some of the documents in the appendices require the Adobe Acrobat
plug-in to be present on your computer. This free software component
allows for the viewing and printing of files saved in the Portable Document
Format (.pdf) Additional information and downloads are available at
www.adobe.com.
A.
Checklist Submittals and Design Approval
1.
Preliminary Design Submittal Checklist (design_checklist.pdf)
(ARB_Color
Board)
2. New Construction Document Submittal Checklist (Construction
Document Approval Checklist.doc)
3. Landscape Plan Submittal Checklist (landscape_checklist.pdf)
4. Preliminary Design/Construction Document Submittal Checklist for
Additions and Renovations (addition_renovation.pdf)
5. Architectural Certification Sample Letter (arch_certification.pdf)
6.
Non-Structural Modification Request Form (modification_request
form.pdf)
7.
Acknowledgement Statement for Lot Potentials (acknowledgement_statement.doc)
B.
Sample Plans
1.
Site Plan with Erosion Control Measures (Site
Plan)
2. Typical Elevations (North),
(South),
(East),
(West)
3. Typical Landscape Plan (Landscape
Plan)
4. Plant List (plant_list.pdf)
C.
Material Samples (click images to enlarge)
BRICK
Materials And Colors: red and red/brown toned brick is a product
of the natural North Carolina clays and is preferred. |
USES
Foundations, chimneys and retaining walls have traditionally been
constructed of masonry. Brick used as a veneer for siding may only
be used if it is not terminated on an outside building corner. |
 |
 |
 |
|
DRIVEWAYS
Materials And Colors: Dark or tinted concrete, asphalt, brick or
stone pavers, aggregate concrete, etc. Natural concrete is not allowed. |
USES
These materials may be used for the surface of the driveway. |
 |
 |
 |
 |
WOOD
SIDING
Materials And Colors: Dimensional, wood siding used in lap or board
and batten configuration is commonly used throughout North Carolina.
Occasionally, cedar shingles are substituted as the primary siding
material. |
USES
Wood siding may only be used for siding. |

Beveled Lap
|

Channel Rustic
|

Shingle
|

Beaded Beveled
Lap |
SHINGLES
Materials And Colors:Dark grey, dark brown, or black asphalt shingles,
slate or cedar shakes are seen on the finest historic homes in North
Carolina. |
USES
Asphalt and slate shingles may only be used for roofing. |
 |
 |
|
|
STONE
Materials And Colors: Natural tan, brown and gray stone. |
USES
Foundations, chimneys and retaining walls have traditionally been
constructed of stone |
 |
 |
|
|
D.
Special Building Guidelines and Building Envelopes
MILLINGPORT BUILDING GUIDELINES
1. A minimum heated living area of 1200 square feet.
2.
Exterior architecture of Millingport homes must be consistent with
the existing architecture and design of Millingport Cottage Homes
and adhere to all material guidelines noted in the Uwharrie Point
Architectural Guidelines and the covenants, rights and restrictions
for all properties at Uwharrie Point.
3.
A professionally designed landscape plan must be submitted for approval
prior to construction and must be compatible with present and future
construction.
4.
Site plans need to indicate the distance of any adjacent homes from
the common property line. Homes should be situated to the maximum
extent away from the existing neighbor.
5.
Declaration of Covenants, Conditions and Restriction for Cottage
Lots at Uwharrie Point, Millingport Neighborhood, Article VI, Section
3(b); Minimum setback lines shown on the recorded plat of the
Properties are not intended to engender uniformity of setbacks; they
are meant to avoid overcrowding and monotony. It is intended that
setbacks may be staggered where appropriate so as to preserve important
trees, and assure vistas or water and open areas. The Committee reserves
the right to select the precise site and location of each house or
other structure on each Lot and to arrange the same in such manner
and for such reasons as the Committee shall deem sufficient. No building
or structure or any part thereof shall be located on any Lot nearer
to the front line or nearer to the side street line than the minimum
setback lines shown on said recorded map.
6.
Setbacks for Millingport are different than those in other neighborhoods.
Setbacks from the property line for lots in Millingport are as follows:
Lots
1-34, 48-78, and 86-90 (Phase I & II):
Front: 20
Side: 2 minimum total 15
Rear: 20
Rear Lakefront: 40
Rear Golf Course: 50
Lots
34-47 and 79-85 (Phase III):
Front: 5
Side: 5
Rear: 5
Side on Corner: 5'
Rear Lakefront: 40'
SWIFT
ISLAND BUILDING GUIDELINES
1. A minimum heated living area of 1800 sq. ft.
2.
Exterior construction of home to be consistent with present and future
construction
and adhere to all material guidelines noted in these guidelines and
the covenants and restrictions for Uwharrie Point.
3.
Brick or flagstone patios, porches, walks, painted wrought iron railings,
etc. are
requested. If grade conditions require the use of decks, then deck
supports
and handrails must be architecturally designed, detailed and painted,
with
heavy material to be used for lattice to serve as deck skirting.
4.
Two (2) front yard street trees of 2 - 3 caliper that
offer colorful fall foliage are
required.
5.
Uniform post lamp to match exterior of the home to be installed at
the apex of the
driveway.
6.
Service area must be enclosed and all utility boxes attached to the
residence must
be painted to match the exterior of the home.
7.
Sod and sprinkler system are encouraged for the perimeter of the home
with a
strong emphasis on landscaping.
SOUTHPOINT
BUILDING GUIDELINES
1.
A minimum heated living area of 2500 sq. ft.
2.
Setbacks
Because of the unique nature of the Southpoint lots, recommended building
envelopes have been established and are indicated on the following
pages in this section. Most Southpoint lake lots adhere to the 100
ft. (from mean lake level) rear setback which is standard throughout
Uwharrie Point. Golf lots, other than lots 1-10 are governed by 50
ft. setbacks. Lots 1-10 have individually predetermined rear setbacks
which are recommended in order to maximize
lake and golf views while carefully protecting the character of the
three finishing holes of the Old North State golf course. Rear setbacks
for these lots range from 100 ft. to 175 ft. The recommended
side setback for Lots 1-10 are 20' from the property line.
3.
Second Residences
The covenants permit a second dwelling on Southpoint lots 11-51 only.
These approximately 4 acre lots are the largest properties in the
community and can easily accommodate two dwellings on the homesite.
These lots cannot be subdivided into two lots but the second dwelling
does enable construction of a family compound. In addition
to the general terms and conditions in the ARB guidelines these second
residences must comply with the following:
a.
The minimum heated square footage must be at least 2,500 square
feet if
the second dwelling is built prior to the main residence. If the
second dwelling is built after the main residence the minimum square
footage allowed is 1,200 sq. ft. The maximum sq. footage should
not exceed 3,000-sq. ft. on the secondary residence, but could be
reviewed on an individual basis.
b.
The materials used in construction must be substantially identical
to those
used in the primary residence.
c.
Unless otherwise approved, the site location must be in the designated
building envelope for the secondary home location. Each case will
be
reviewed on an individual basis.
d.
The design must be compatible with the primary residence.
4.
Driveways
Southpoint driveways that connect to the primary Southpoint artery
(Southpoint Lane) will need to cross a ditch section adjacent to the
street. The culvert design options for these crossings appear later
in these guidelines and are required in all such ditch crossings.
Other Southpoint driveways connect with cul-de-sac streets which are
curbed such that no ditch section crossing is necessary.
All
driveways serving Southpoint lots must comply with the hard surface
material standards described elsewhere in these guidelines. A possible
exception might occur when a driveway of substantial distance exists
(several hundred feet). In this case, the approved hard surface driveway
materials must be used on the driveway for at least a distance from
the street that is sufficient to insure that any change in materials
is not and will not become visible from the street. A minimum of 100
but no sooner than it is out of sight is required before a change
in driveway material may be made. The required distance may be increased
by the ARB if the change in driveway materials i |