Preliminary
Design/Construction Submittal Checklist for Additions/Renovations
Please complete and
submit the following checklist. If an
incomplete checklist is submitted, the ARB will automatically reject your
submittal.
I. OWNER DATA
Owner’s Name:
Mailing Address:
Phone:
Home Mobile Office Fax
Lot #: Neighborhood:
II. CONTRACTOR DATA
Builder’s Name:
Company:
Mailing Address:
Phone:
Home Mobile Office Fax
Job Superintendent: Mobile #:
III. DRAWING CHECKLIST
A. Site
Plan (See Appendix B): Existing Conditions and Site Information
Office
Owner
Use: Use:
1. North Arrow
2. Scale (Minimum scale
- 1”=30’)
3. Property
Lines
4. Lot Numbers
of Adjacent Lots
5. Corners of
Adjacent Structures
6. Setbacks
7. Wetlands
8. Wetland
Buffers
9. Structures
with Finished Floor Elevations
Development
Proposed:
Office
Owner
Use: Use:
10. Outbuildings
with Finished Floor Elevations
11. Retaining Walls
12. Driveway
Location and Materials
13. Fencing
14. Proposed
Contour Lines
15. 40’ setback from rear property line on lakeside properties, but in
no case less than 50' from normal full pool lake level. (Applicable to
lakefront lots in Allenton Ferry, Pennington Ferry, Glenbrook Springs and
Millingport.)
16. 100’ setback from normal full pool lake level (lakefront lots)
17. Clearing
Limits
18. Silt Fence
19. Drainage Inlet
Protection
20. Exterior
HVAC Units
B. Architectural Plans Checklist (See Appendix B): Min. scale 1/4”=1’0”
Office
Owner
Use: Use:
1. Floor Plans
of Each Level with Heated Square Footage
Heated and Cooled:
Main
Level ___________ sq.
ft.
Upper
Level ___________ sq.
ft.
Basement ___________ sq. ft.
Other ___________ sq.
ft.
Total ___________ sq.
ft.
Under Roof:
Covered
Porches ___________ sq. ft.
Garage ___________ sq. ft.
Terrace/Decks ___________ sq. ft.
Other ___________ sq.
ft.
Total ___________ sq.
ft.
2. Building
Elevations of all Sides Indicating Exterior Materials,
(i.e.,
Siding, Stone, Brick, etc.), Door and Window Locations,
Roof
Pitch and Finished Grade
C. Landscape Materials Proposed: (minimum scale: 1” = 20’)
Office Owner
Use: Use:
ź ź 1. Plant
Material (note full common names and color)
ź ź 2. Quantities
of Plant Material
ź ź 3. Spacing of
Plant Material
ź ź 4. Sizes of
Plants at Time of Installation including height and spread
ź ź 5. Show Areas
to be Mulched and Material Proposed
ź ź 6. Show Areas
to be planted in Grass or Sod
Office
Owner
Use: Use:
1. Payment of Submittal Fee
2. Payment of Compliance Deposit
V. COMMENTS:
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
__________________________________________________________________
I
have reviewed and approved the submittal being presented to the Architectural
Review Board, and agree to all conditions as set forth in the Architectural
Guidelines. Furthermore, I understand
the compliance deposit may be used by the ARB to correct “out of compliance”
issues and/or “site deficiencies”.
______________________________________ ________________________
Signature of Property Owner Date