LANDSCAPE PLAN
SUBMITTAL CHECKLIST
Please
complete and submit the following checklist with the landscape plan and plant
list for review by the Architectural Review Board. If an incomplete submittal is presented, the ARB will
automatically reject your Landscape Plan submittal. In order to be placed on the agenda, all submittals must be
received in the Community Association office one week prior to the scheduled
meeting.
I. OWNER DATA
Owner’s Name:
Mailing Address:
Phone:
Home Mobile Office Fax
Lot #: Neighborhood:
II. LANDSCAPE CONTRACTOR DATA
Contractor’s Name:
Company:
Mailing Address:
Phone:
Home Mobile Office Fax
Job Superintendent: Mobile #:
III. LANDSCAPE PLAN
CHECKLIST
A. Landscape Plan (See
Appendix B): - 1” =20’ minimum scale
Office
Owner
Use: Use:
1. North
Arrow
2. Scale (Minimum scale - 1”=30’)
3. Property
Boundaries
4. Existing
and Finished Contour lines
5. Lot
Numbers of Adjacent Lots
6. Structures
Proposed
7. Corners
of Adjacent Structures
8. Outbuilding
Proposed
9. Driveway
Location and Material
10. Retaining
Walls Proposed (note color, materials, height)
Office Owner
Use: Use:
11. Wetlands
12. Fencing
Proposed
13. Proposed
Clearing Limits
14. 40’ setback from rear property line on
lakeside properties, but in no case less than 50' from normal full pool lake
level. (Applicable to lakefront lots in Allenton Ferry, Pennington Ferry,
Glenbrook Springs and Millingport.)
15. 100’ setback from normal full pool lake
level (lakefront lots)
16. Exterior
HVAC Units
17. Location
and screening of grinder pump and propane tanks
18. Utility
Meters
19. Screening
of Service and Trash Areas
20. Lighting
with Spec Sheet
21. Form
of Irrigation (lake, well, etc.)
IV. Landscape Materials Proposed:
Office Owner
Use: Use:
22. Plant
Material (note full common names and color)
23. Quantities
of Plant Material
24. Spacing
of Plant Material
25. Sizes
of Plants at Time of Installation including height and spread
26. Show
Areas to be Mulched and Material Proposed
27. Show
Areas to be planted in Grass or Sod